Tests

Tests are open book, open note, open computational tool. Individual work is required. Tests are normally based on a single design oriented problem. The exams will cover review of basic electronics, mine dewatering systems, hoists, conveyors, and mine electrical systems. The tests are non-comprehensive with the last test constituting the final exam.  Since only the best 4 tests are counted toward your grade, you may drop any test including the final.  (As a matter of strategy, some students may wish to work to score high on the first 4 tests in order to simply not show up for the final at all.  They will of course flunk the final, but since it is dropped that is not very significant.  This may leave students free for other final exams and end of semester crisis).

Up
Old Test Archives

Tests\440 test 1 fall 2004.doc

Retake pump Midterm.doc